Gusto MSC, mounting procedures for the 450mT A-frame

 

In order to evaluate the feasibility and safety, and to support the risk analysis process of several alternative mounting procedures for the 450mT A-frame of the heavy lift crane on the Oleg Strashnov, Tree C supplied a real time simulator for this operation. It includes realistic behaviour of the Bonn&Mees sheerleg Matador 3, the supply barge with A-frame and the slewing platform of the Oleg Strashn

ov. The system is controlled either by GUI or a multi channel MIDI-controller.